Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Temporary Bagnell Dam Road Closure; Road Maintenance Project Beginning: The roadway over Bagnell Dam will be closed tomorrow (3/18/26) for MODOT maintenance work along the route. Residents will be able to access the Bagnell Dam Strip by way of Highway 242 or use of Bagnell Dam Boulevard off of Highway 54.Also beginning tomorrow is a City road sealing project in the area of the Bagnell Dam Strip, from Bagnell Dam to Flynn Road beginning at 7:00 A.M. One traffic lane and several parking areas will be closed at a time, and the application is safe to drive on once the contractor has reopened the roadway. The road sealing project will continue through the rest of the week, with Thursday (3/19/26) seeing work performed from Flynn Road to the MM Overpass, and Friday (3/20/26) seeing work completed from the MM Overpass to Osage Beach Parkway.Traffic flow will be maintained during the duration of this project.

TEST TW WEATHER

Rally On The Strip Returns!

Rally on the Strip, presented by Head Motor Company returns to the beautiful Lake of the Ozarks for another incredible four-day motorcycle celebration.

ROAD CLOSURE DETAILS:
Times: 5:00 PM – 2:00 AM on September 11th, then 10:00 AM – 2:00 AM daily September 12th-14th
Location: Bagnell Dam Strip from School Road intersection to Bagnell Dam
Center lane motorcycle parking begins at 10:00 AM on Wednesday, September 11th. Parking available through 11:59 PM on Saturday, September 14th.

DETOUR INFORMATION:
Valley Road is available as an alternate route
Delivery vehicles and residents with addresses on streets off the Strip will have access to the area

We appreciate everyone’s patience and cooperation during this exciting event. Come join us for four days of incredible bikes, great food, live entertainment, and the atmosphere that makes Rally on the Strip a Lake of the Ozarks tradition!